This project involved transforming an overgrown and unmanaged drainage area into a properly graded pond water inlet designed to improve water flow and reduce erosion.
Before work began, the area consisted of brush, trees, and uneven ground that limited proper runoff into the pond. After clearing the vegetation, we graded the inlet and constructed a terrace to direct water efficiently while protecting the surrounding land.
The completed project provides a clean, functional inlet that improves drainage, controls erosion, and supports long-term pond performance.